WEBCOR CONSTRUCTION LP DBA WEBCOR BUILDERS (4)

By: Rick Waldinger

43  COR 40-7468 [¶22,636]

HOUSEKEEPING – MATERIAL STORAGE AREAS AND WALKWAYS REASONABLY FREE OF DANGEROUS DEPRESSIONS, OBSTRUCTIONS AND DEBRIS
Cal. Code Regs, tit. 8, § 1513(c) (2016) – Employer failed to maintain material storage areas and walkways on a construction site reasonably free of obstructions and debris including rebar, falsework components, lumber and other items.

STANDARD RAILINGS – RAILINGS AND TOEBOARDS
Cal. Code Regs, tit. 8, § 1621(a) (2016) – The Division failed to establish that Employer did not ensure that railings were provided along all unprotected and open sides of access ladders to an elevated platform.

SCAFFOLDS, GENERAL REQUIREMENTS – ANCHORAGE AND BRACING
Cal. Code Regs, tit. 8, § 1637(c) (2016) – Employer failed to brace a falsework tower to prevent it from tipping, or collapsing, prior to disconnecting crane-supported rigging. The violation caused a serious injury. 

ERECTION AND CONSTRUCTION – FALSEWORK AND VERTICAL SHORING
Cal. Code Regs, tit. 8, § 1717(a)(1) (2016) – Employer failed to properly brace a falsework tower to withstand all intended loads prior to disconnecting it from crane-supported rigging. The violation caused a serious injury. 

CRANES AND OTHER HOISTING EQUIPMENT, OPERATING RULES – HANDLING LOADS
Cal. Code Regs, tit. 8, § 4999(h) (2016) – Employer failed to have a qualified rigger verify that a falsework tower was braced to prevent inadvertent movement before it was detached from crane-supported rigging. The violation caused a serious injury.

Read More...

This content is for premium subscribers. To read please login or subscribe below.

Subscribe Log In